Renovating your kitchen is an exciting journey, but understanding the timeline can make the process smoother and more predictable. At T Se7en Alucraft, we’ve developed a proven 5-phase kitchen renovation timeline tailored to Singapore’s unique building regulations and climate conditions. Whether you’re renovating an HDB, condo, or landed property, our structured approach ensures efficiency, minimal disruptions, and on-time project completion. With a track record of 95% on-time deliveries, we’ll guide you through every stage from consultation to final inspection ensuring your dream kitchen becomes a reality, on time and within budget.
The kitchen renovation timeline in Singapore usually spans 4–8 weeks, but the exact duration depends on property type, renovation complexity, and permit approval requirements.
At T Se7en Alucraft, our Singapore kitchen renovation timeline follows a structured 5-phase process consultation, permits, demolition, installation, and final inspection that achieves 95% on-time completion rates across projects. This systematic approach ensures consistency, reduces costly errors, and adapts to both simple HDB kitchens and complex landed property renovations.
The kitchen renovation timeline in Singapore is not a random process; it follows a structured path to ensure projects are delivered on time, within budget, and in compliance with national housing regulations. At T Se7en Alucraft, we break every renovation project into five clearly defined stages, each with its own purpose, specialists, and duration.
This structured 5-phase kitchen renovation timeline Singapore homeowners rely on is why T Se7en Alucraft consistently delivers projects with 95% on-time completion rates. Unlike ad-hoc contractors, our systematic approach reduces disputes, minimises disruptions, and creates a transparent renovation journey from start to finish.
The consultation and design phase is the first and one of the most crucial steps in the kitchen renovation timeline. For most homeowners, this phase typically takes 5–7 working days. During this time, our design team works closely with you to ensure that your kitchen renovation meets both your aesthetic preferences and functional needs. Here’s a detailed breakdown of what this phase entails:
Our team visits your property to conduct thorough measurements of the kitchen space. We assess the existing structure, layout, and utilities to understand any limitations or opportunities for improvement. This step ensures that the design we create fits perfectly within the space while adhering to safety standards and Singapore’s building regulations. Any potential structural issues, such as load-bearing walls or plumbing obstacles, are identified early on to avoid complications later in the process.
Using state-of-the-art 3D design software, we create realistic visualisations of your future kitchen. These renderings help you visualise how the new layout, materials, and finishes will look once completed. You’ll have the opportunity to make adjustments and provide feedback before finalising the design. During this stage, we also guide you through selecting materials that best suit your style and the practical demands of your kitchen. Whether you prefer natural stone countertops or modern, durable tiles, we ensure that your choices complement the overall design and functionality of your space.
Once the design is finalised, we move on to discussing the project scope, budget, and expected timeline. Our goal is to provide a transparent and detailed plan that aligns with your expectations. We ensure that all aspects of the renovation ranging from design changes to the type of materials used are factored into the budget. We also provide a clear and realistic timeline, taking into account factors like material availability, construction complexity, and any required permits. This phase ensures that you have a clear understanding of the costs, timelines, and expected outcomes before the renovation begins.
For more complex renovations, such as those in landed properties or projects that require significant structural changes, the consultation and design phase may extend to 10–14 working days. These projects may involve custom cabinetry, open-plan layouts, or luxury finishes, which require additional design iterations and consultation with structural engineers.
The permit and approval phase is a critical component of the kitchen renovation timeline in Singapore, as it ensures your project complies with local building regulations and safety standards. The time it takes to secure the necessary approvals depends on your property type and the complexity of the renovation. Here’s a detailed breakdown:
For HDB kitchen renovations, you will need to submit an application through the official HDB portal. The typical approval time for HDB renovations is between 7–14 working days, depending on the scope of the renovation. The process includes submitting detailed plans of the proposed changes to the HDB, which includes your kitchen layout, design, and the type of modifications you intend to make.Once the application is submitted, HDB reviews it to ensure it aligns with their guidelines and regulations. These rules are in place to ensure the safety of residents and preserve the structural integrity of the building. Delays can occur if additional documentation or clarifications are needed, so early submission is highly recommended to avoid project setbacks.
For condo kitchens, the approval process is a bit more complex. You will need to obtain building management approval from the condo’s management committee. This involves submitting your renovation plans to them for review to ensure they comply with the building’s rules and regulations. Additionally, neighbour notifications are required to inform other residents about the renovation and its potential impact on their daily lives, such as noise or disruptions.The approval time for condo renovations may vary, typically taking between 5–10 working days, depending on the efficiency of the management committee. If the building management has specific requirements or if there are unforeseen concerns from neighbours, this process can be extended, so it's important to plan for potential delays.
If your renovation involves structural modifications (such as wall removal, ceiling adjustments, or other major alterations), additional approvals are required. This step includes obtaining Professional Engineer (PE) certification to confirm that the planned structural changes will not compromise the safety or integrity of the building.The process for structural modifications typically takes 14–21 working days, as it involves more detailed assessments, including structural calculations, safety evaluations, and approval from both the authorities and the PE. This phase requires careful planning to ensure all modifications are carried out safely and within regulatory guidelines.
Early submission of your permit applications can significantly reduce delays in your renovation timeline. T Se7en Alucraft helps homeowners navigate the complex permit process by preparing and submitting all necessary documentation on your behalf. Our team is well-versed in Singapore's regulations, ensuring that all paperwork is accurate, complete, and submitted in a timely manner. By managing the approval process efficiently, we help keep your project on track, ensuring that it proceeds without unnecessary hold-ups.
The demolition stage in the renovation timeline lasts 3–5 working days for standard projects, and 5–7 days when walls are removed.
Preparation includes:
Proper preparation prevents costly installation delays later in the timeline for kitchen renovations.
The installation and construction phase is the most intensive and crucial part of the kitchen renovation timeline in Singapore. This phase typically spans 2 to 3 weeks, depending on the complexity of the project and the level of customization. It involves various specialist trades working in coordination to transform your kitchen design into reality. Each stage of installation requires careful attention to detail to ensure the best quality and durability, which is why T Se7en Alucraft follows a streamlined and well-organized process to ensure smooth execution.
The cabinet installation is the first major step in the construction phase and typically takes 3–5 working days for standard kitchen renovations. This process includes:Fitting the base cabinets: Ensuring that each piece is securely mounted and aligned properly for a functional and aesthetically pleasing result.Adjusting for any unique site conditions: Taking into account uneven walls, floors, or spaces that may require adjustments to ensure cabinets fit perfectly.Securing shelves, drawers, and hardware: Once the base cabinets are in place, drawers, shelves, and cabinet hardware such as handles or knobs are fitted. This part of the process requires precision to ensure everything is level and functional. Our experienced team at T Se7en Alucraft ensures that each step is performed meticulously to prevent issues down the line.
After the cabinets are installed, we move on to the countertop fabrication and fitting, which generally takes 5–7 working days. During this stage, the following happens:Measurement and templating: Accurate measurements are taken to create a perfect template for the countertop to ensure a seamless fit.Material cutting and finishing: Whether it’s natural stone like granite or marble, engineered stone, or laminate, the countertop material is carefully cut, polished, and finished to the required dimensions. Custom countertops may take a little longer if the material requires specialized cutting or finishing.Installation: Once fabricated, the countertop is delivered and installed. The team ensures it’s securely placed, aligned, and joined to the base cabinets without gaps or imperfections. Special care is taken around sink cutouts, cooktops, or faucets to ensure a flawless finish.
Once the cabinets and countertops are in place, the final steps include appliance integration and finishing. This phase typically takes 4–6 working days and includes:Appliance installation: Major kitchen appliances like refrigerators, ovens, dishwashers, hobs, and microwaves are carefully installed, ensuring that all connections (plumbing, electrical, and gas) are securely made and compliant with safety standards.Ventilation & ductwork: If the kitchen includes a range hood, proper ductwork and ventilation installation are carried out to ensure air circulation and safety.Finishing touches: This includes installing backsplash tiles, lighting fixtures, and additional detailing such as trims and moldings around cabinetry and countertops. The space is cleaned thoroughly after these final installations.
At T Se7en Alucraft, we pride ourselves on delivering high-quality workmanship that adheres to the agreed timelines. Our organized approach and meticulous attention to detail ensure that your kitchen renovation is completed efficiently and to the highest standards.
Final inspection closes the kitchen renovation timeline Singapore homeowners rely on.
Non-compliance corrections can extend the project timeline by 3–7 days, but T Se7en’s regulatory expertise reduces this risk significantly.
Even the best-planned kitchen renovation timeline may face obstacles:
T Se7en Alucraft’s 5-phase kitchen renovation timeline ensures efficiency, transparency, and on-time delivery for your kitchen renovation in Singapore. Our approach is built around these core phases:
Stay informed with regular progress reports, keeping you in the loop and helping manage expectations throughout the project.
Real-time monitoring of your renovation ensures accuracy, proactive issue resolution, and efficient task management.
After each phase, we conduct thorough quality checks to ensure everything meets building standards and your expectations.
Our structured timeline and proactive communication result in a high success rate, ensuring your renovation is completed on time.
Whether it’s an HDB, condo, or landed property, our system adapts to each project’s needs, offering a smooth and reliable experience.
By using this proven process, T Se7en Alucraft ensures a stress-free, on-time kitchen renovation that meets both your aesthetic and functional goals.
Plan Your Kitchen Renovation with T Se7en Alucraft Proven 5-Phase Timeline
✔️ 95% on-time completion
✔️ Realistic, regulation-compliant schedules
✔️ Transparent weekly updates
The typical kitchen renovation timeline in Singapore ranges from 4 to 8 weeks, depending on property type and complexity. T Se7en Alucraft ensures a systematic and structured renovation timeline, maintaining efficiency and minimizing delays for both HDB and landed property projects.
Delays can arise from permit approval issues, material delivery problems, weather disruptions, or hidden structural issues. T Se7en Alucraft proactively manages these risks through early permit submissions and supplier coordination, ensuring timely project delivery despite challenges.
To avoid delays, submit permits early, pre-order materials, and conduct thorough site assessments before work begins. T Se7en Alucraft offers expert project management and contingency planning to keep renovations on track, regardless of potential setbacks.
Custom cabinets and countertops typically add 10–14 working days to the timeline. T Se7en Alucraft minimizes these delays by manufacturing custom components in parallel with site preparation, reducing the overall renovation timeline and ensuring smooth transitions from one phase to the next.
The demolition and preparation phase is crucial. Rushed preparation can lead to installation delays and rework. T Se7en Alucraft emphasizes detailed preparation to avoid costly mistakes and ensure timely progress throughout the renovation process.
Yes, renovations can continue during Singapore’s monsoon season. However, T Se7en Alucraft adjusts the renovation schedule to manage weather disruptions effectively, ensuring that the project continues smoothly while adhering to safety standards and timelines.