A turnkey interior design and renovation service means one company handles your project from the first design to the day you get the keys back: the design, the quotation, any permits, every trade on site, the carpentry and the final handover. You sign one contract and deal with one team, instead of hiring an interior designer, a contractor and a carpenter separately and coordinating them yourself.
(Concepcion Interiors Pte Ltd), T Se7en Alucraft’s parent’s company, has worked on renovation projects at our own Singapore workshop since 1996, including kitchens, wardrobes and built-in storage. We work with Concepcion Interiors, which brings over 30 years of interior fit-out experience, on interior design, home renovation and full house renovation projects. Check out concepcion website for all the turn key projects we have completed, including pictures.
Before you sign any turnkey contract, ask three things: which company manages your project, which trades are included, and who fixes defects after handover. We’ve completed over 120+ turnkey projects for hotels, resorts, landed homes, and residential homes.

A turnkey renovation in Singapore typically covers the main stages of a home renovation, from interior design and quotation preparation to site works, carpentry installation, project coordination and final handover. The exact scope varies between renovation companies, so homeowners should confirm all inclusions, exclusions, materials and warranty terms in their written agreement before work begins.
Here’s what each stage usually involves and how T Se7en Alucraft approaches the services described in our renovation scope.
| Stage | What’s Included |
|---|---|
| Interior design and planning | Space planning, room layouts, material selection and design coordination through our interior design services. Confirm whether 3D drawings and design revisions are included in your package. |
| Itemised renovation quotation | A detailed quotation covering the agreed rooms, materials, renovation works and specialist trades. Review inclusions, exclusions and additional charges before signing. |
| Permits and approvals | Identification of renovation works requiring regulatory approval, including applicable HDB renovation permits. For landed properties, certain additions and alterations may require a Qualified Person (QP) and submissions to the relevant authorities. The responsible applicant should be identified before work starts. |
| Renovation and site works | Depending on the agreed scope, works may include hacking, masonry, tiling, plumbing, electrical installation, ceiling works, flooring and painting. Regulated works must be performed by appropriately licensed personnel. |
| Custom carpentry and cabinetry | Custom aluminium kitchen cabinets, aluminium wardrobes and storage solutions. Material specifications, hardware, workshop fabrication and installation arrangements should be confirmed in the quotation. |
| Project management | Coordination of renovation schedules, trades, site progress and client communication through a designated project contact. The frequency and method of progress updates should be agreed upon before work begins. |
| Final inspection and handover | A walkthrough against the agreed renovation scope, documentation of outstanding defects, rectification arrangements and final handover. After-sales support and product warranties depend on the applicable written terms. |
There are three common ways to run a renovation in Singapore. The right one depends on how much time you have and how much control you want.
| Turnkey (design and build) | Interior designer + separate contractor | Managing trades yourself (You engage direct contractor). |
Who you deal with | One company | A designer, then a contractor | Every trade directly |
Contracts | One | Usually two or more | One per trade |
Who is responsible for defects | Usually the turnkey company, as stated in the contract | Split between designer and contractor, as stated in each contract | You sort out which trade caused it |
Owner coordination | Typically less: you still approve designs, materials and changes | Some: you coordinate between designer and contractor | Most: you schedule and check every trade |
Control over each supplier | Less: the company chooses the trades | More | Full |
Best for | Busy owners, full renovations, new keys | Owners who want a specific designer | Small jobs and experienced renovators |
Where the contract makes one company responsible for the whole job, a problem that crosses trades has one owner. For example, if a wall is built out of line and the cabinets no longer fit, the turnkey company fixes it, instead of the carpenter and the contractor blaming each other. That only holds if the contract says so, which is why the contract checks below matter. The trade-off is less choice over who does each trade. For example, we often see LED lights on a glass display cabinet being join together with the ceiling lights. This single connection already affects the false ceiling trade, electric trade, as well as the carpentry works.
For a single room, such as replacing a kitchen, you usually don’t need a turnkey contract; we can quote for the cabinetry alone.
A single contract only protects you if it’s clear. Before you sign, check:
The warranty and defects period, and who to call.
Before signing a turnkey renovation contract in Singapore, confirm the contractor’s HDB registration, renovation permit responsibilities, specialist trade licences and written contract terms. For works requiring an HDB renovation permit, the homeowner must authorise the registered contractor to submit the electronic application. Work requiring approval must not begin until the relevant permit has been granted.
Check the following before signing:
HDB contractor registration and workmanship: Confirm which company will sign the renovation contract and which DRC-listed company will carry out the HDB renovation works. A listing in HDB’s Directory of Renovation Contractors (DRC) does not guarantee workmanship quality. As HDB states on its official Looking for Renovation Contractors page:
“HDB does not endorse nor guarantee the quality of their works.”
Ask for completed project examples, customer references and evidence of previous workmanship before engaging the contractor.
HDB renovation permit application: Confirm which DRC-listed renovation contractor will submit the application on your behalf. HDB requires the homeowner’s authorisation and a signed acknowledgement form. For certain renovation works, such as wall demolition, the contractor must also submit a floor plan showing the proposed changes. See HDB’s Application for a Renovation Permit.
Licensed specialist contractors: Check that regulated works are assigned to appropriately qualified personnel. Depending on the renovation scope, this may include an EMA Licensed Electrical Worker for electrical installation, a BCA-trained air-conditioner installer, a BCA Approved Window Contractor for relevant window works, a PUB Licensed Plumber for regulated water and sanitary plumbing, or an EMA Licensed Gas Service Worker for gas works. Certain works may also require a Qualified Person (QP). Refer to HDB’s renovation permit requirements and water, sanitary plumbing and gas guidelines.
Defects, variations and delays: Review how the written renovation agreement handles defect rectification, additional works, changes to the quotation, payment milestones and project delays. Confirm who is responsible for addressing problems during renovation and after handover.
For help reviewing costs and exclusions, read our guide to comparing renovation quotations. To assess a renovation company’s experience and suitability, see our guide to choosing a renovation contractor in Singapore.
The total depends on the size of the home, how much is hacked and rebuilt, the materials, the amount of carpentry and whether permits or structural works are needed. A clear turnkey quotation should also show how these items are charged:
Item | In our quotations |
Design fee | Included / separate line depending if you need us to design. |
Project management | Included / separate line. |
Trades done by partners | Itemised by trade, or within one total. |
Variations after signing | How priced: e.g. quoted in writing before the work. |
Carpentry | Itemised by item. |
For typical budgets by home type, see our home renovation cost guide.
A successful turnkey renovation requires coordination between design planning, site works, custom carpentry, installation and final handover. In one of our projects, our team managed the renovation process from planning through completion, including coordinating cabinetry ahead of the project’s Temporary Occupation Permit (TOP) milestone.
This project illustrates how construction scheduling and early coordination can help prepare different renovation works for their required completion stages.
| Details |
Home type and area | Ee.g. landed project with 10 separate rooms excluding wet and dry kitchen. |
Owner’s brief | What the owner wanted |
Work completed | Rooms and trades we handled under one contract |
Challenge | There were really unique applications that was not done conventionally. |
Our solution | How we solved it |
Timeline and photos | You should have some of the before and after photos. |
This was a real turnkey project which was fully managed end-to-end in-house. Notice that the cabinetry was provided before TOP, to ensure all testing pass and we can deliver the project on time.
For SQ@Sengkang West we fabricated and installed cabinetry for 39 apartments: 78 kitchens, 117 wardrobes and 234 beds, completed in 12 days. The fabrication was done off-site, but all the cabinets was bought on-site to be assembled and installed. It shows the scale our workshop and installation team can handle; it was a cabinetry project, not a turnkey renovation.

Material selection plays a significant role in the longevity and performance of kitchen cabinets, especially in Singapore’s humid environment.
The home is handed back ready to use: one company has delivered everything from design to handover.
Not necessarily. A turnkey quote may include design, project management and renovation works under one contract, but companies present these costs differently. Compare quotations using the same materials, scope, exclusions and payment stages. A lower first quote may not be cheaper if essential work is excluded or charged later as a variation.
Yes. You approve the layouts, materials and finishes during the design stage; the turnkey company then builds what was agreed.
No. A package is a fixed set of works at a fixed price. A turnkey project is designed and quoted for your home, and can cover a single flat or a landed house.
The contractor submits the electronic application to HDB, and the contractor must be listed in HDB’s Directory of Renovation Contractors.
The total depends on the scope. You should have some from the many articles i have prepared for you. Within that, cabinetry takes 2 to 6 weeks to fabricate and 1 to 10 days to install.
Speak to a professional now and get personalized consultation and guidance for your next renovation. Work with a team you can trust!

Home Blog A turnkey interior design and renovation service means one company handles your project from the first design to the day you get the...